Lighting up lives, wiring up worlds.

Power, light and life safety for London’s buildings.

What

Electrical packages: containment, distribution, lighting, life-safety supplies, testing and maintenance.

Who for

Principal contractors, developers, landlords, managing agents and facilities teams.

Where

Across London, from our base in Leyton, E10.

S&M engineer in hi-vis and a hard hat installing a rooftop light, with the City of London skyline behind
On site · rooftop lighting · East London
Project schedule

Our work, way by way

All projects →
Project schedule
WayProjectAreaSectorOur scopeStatus
01Haymarket HotelSW1YHospitalityContainment from B2 to level 8; guest-room first and second fix, 520 rooms.In progress
0289 Eccleston Square HotelSW1VHospitalityTemporary supplies for the roof BMU and lift survey; main package for 297 rooms.Mobilising
03Piccadilly Community CentreW1DCommunityLV distribution, lighting, power, containment, damper supplies, testing.In progress
04Trent Park House museumEN4HeritageFull electrical fit-out of a museum in a Grade II listed mansion, including the basement restored to its Second World War state.Museum open
05Carrera TowerEC1VResidentialInternal and external lighting, containment and fire alarm testing at a major residential building, with minimal disruption to residents.Completed
06Anvil’s HammerLondonResidentialFull electrical design and installation for a new high-specification home: heat pump, underfloor heating, MVHR and smart pre-wiring.Completed
Services

Five services, one package

Like the cores of a cable, each service stands on its own and they work together. Take one, or the whole package.

All services →
Core 1

Containment and power

Tray, basket and conduit for every system, and the distribution that feeds them.

Core 2

Lighting and controls

Lighting installed to programme and handed over working.

Core 3

Life safety and ELV

Supplies and cabling for the systems that keep a building safe and connected.

Core 4

Testing and certification

Inspection, testing and the paperwork that proves it.

Core 5

Facilities management and maintenance

Planned, statutory and reactive work on live installations.

How we work

From drawings to certificate

Stage 1

Tender and pricing

A quantified schedule of rates from your drawings and specification, with clarifications listed up front.

Stage 2

Mobilisation

Activity-specific RAMS, programme, supervision and material call-offs agreed before we start.

Stage 3

Installation

Progress reported floor by floor; variations priced and recorded on change control notices.

Stage 4

Testing and handover

Inspection and test records, EIC certification, as-built information and O&M documentation.

First-fix containment and cabling across a concrete soffit
First-fix containment
Data cabinet with patched structured cabling
Data and comms
Completed office break-out area with recessed lighting and smoke detection
Office fit-out
Warehouse with high-bay LED lighting over racking
Warehouse lighting
Accreditations

Checked, certified, insured

Details →
NICEICApproved Contractor
ISO 9001Quality management
ISO 14001Environmental management
ConstructionlineGold member
TrustMarkGovernment-endorsed quality scheme
RECCRenewable Energy Consumer Code
EVCCConsumer code for home chargepoints

Send us the drawings.

Share the tender documents and return date. We confirm receipt and tell you whether we will price.